Welcome to [ Jiangsu Kengbo Heavy Industry Co., Ltd. ] Official Website!

              HOME    |    Contact us    |    Sitemap

              13585000194
              15861488616
                CONTACT US
              • Contact: Mr.Wang
              • Mobile: 13585000194
              • Mobile: 15861488616
              • Tel: 0510-85388408
              • Fax: 0510-85388408
              • Web: vlwikwo.cn
              • E-mail: sales@wxkbjx.com
              • 502492439@qq.com
              • Add: 42 Yuanqiao Road, Yixing
              • Economic Development
              • Zone, Wuxi City
              PROBLEM

              Position:Home > PROBLEM >

              Advantages of Construction of Fully Mechanized Draft

              Safe and reliable, on the soil disturbance small clearance clearance Pile construction method in the steel casing within the clearance pile and backfill construction, the underground undisturbed soil or damage is not small, the underground soil does not cause disturbance or produce a small The disturbance. As the steel casing on the hole wall support, in the steel casing around the soil stress has not yet released, it has been removed and timely backfill obstacles, the surrounding structures had no effect.

              Prev:None

              Next:None

              日韩熟女精品一区二区三区,97在线免费观看视频,韩国一级无码黄色视频,亚洲国产成人VA在线观看