Auxiliary test conditions
1, Equipment foundation concrete including secondary grouting strength has reached the design requirements.
2, The installation work has been completed and acceptance, complete installation records.
3, Equipment and systems such as the internal and surrounding scaffolding and other temporary facilities have been removed, all the debris has been cleared clean equipment and the system inside and outside according to the test range has been closed and isolated.
4, The relevant places are well lit and have the necessary communication facilities.
5, Lubricants, grease has been added to the design of the amount of lubricant and grade, meet the quality requirements. The oil system has been commissioned.
6, Instrument, instrument, the valve has been installed complete, one by one debugging qualified.
7, The bolts are fastened as required. Protective covers and fences installed to meet the requirements.
8, Rotor disk flexible, no card astringent, friction Sassafras and other anomalies. Cooling water system is smooth, adequate water pressure back to normal water back to water phenomenon.
2, The installation work has been completed and acceptance, complete installation records.
3, Equipment and systems such as the internal and surrounding scaffolding and other temporary facilities have been removed, all the debris has been cleared clean equipment and the system inside and outside according to the test range has been closed and isolated.
4, The relevant places are well lit and have the necessary communication facilities.
5, Lubricants, grease has been added to the design of the amount of lubricant and grade, meet the quality requirements. The oil system has been commissioned.
6, Instrument, instrument, the valve has been installed complete, one by one debugging qualified.
7, The bolts are fastened as required. Protective covers and fences installed to meet the requirements.
8, Rotor disk flexible, no card astringent, friction Sassafras and other anomalies. Cooling water system is smooth, adequate water pressure back to normal water back to water phenomenon.
Prev:Casing
Next:None
related articles
- Introduction of Construction Method of Drilling Biting Pile for Zoomlion ZRT Series Full Rotary Drilling Rig
- Create a third-party full casing and auxiliary parts rental service, and explore new ways of cooperation!
- Wonderful review——into Kengbo Machinery
- The 10th Deep Foundation Engineering Development Forum and the 2nd Deep Foundation Engineering Techn
- The 9th Deep Foundation Forum Highlights
- Kengbo Machinery and Nanjing Yaohang Construction Engineering Co., Ltd. re-engaged to create brillia
- Kengbo mechanical casing escorts Nanjing Yaohang Construction Engineering Co., Ltd.
- Kengbo mechanical casing escorts the bite pile project of Anhui Chuangtai Foundation Engineering Co.
- Keng Bo Machinery 2018 BMW Exhibition Scene Highlights
- The main process points of full - tube full - turn drilling